treatment facility. If the decontamination water and
sediments are defined as hazardous wastes and are to
Electrical Distribution Plan
be taken offsite, the Contractor must manifest the
materials in accordance with 49 CFR 100-180 and 40
Site Control Plan
CFR 263. The materials must be transported by a
certified hazardous waste hauler and the treatment,
Grading Plan
storage, and disposal facility (TSDF) must have the
appropriate EPA and state permits. The Contractor
Vertical Barrier Wall Profiles
should submit the names of all haulers and TSDF
facilities proposed for use. Chemical test results,
Vertical Barrier Wall Typical Sections
manifests, land disposal restriction (LDR) notification
forms, and certifications of final treatment/disposal
Vertical Barrier Wall Plan View Along Centerline
should also be submitted. See EP 200-1-2 for more
detailed information on this subject.
Erosion Control Plan (Temporary)
c. Security fencing. A chainlink security fence
Slurry Wall Corner Details
is often used at the site boundary. The fence nor-
mally has a standard single outrigger with three
Working Platform Cross Section
strands of barbed-wire on the outrigger. The fence
fabric should be a minimum of 1.8 m (6 ft) in height.
Traffic Crossing Cross Section
USACE guide specification CEGS-02831 should be
used in the contract documents to specify fencing
Wash-down Area Cross Sections and Details
requirements.
(Decon Pad)
Monitoring Well Details
B-6.
Potential List of Drawings
Piezometer Details
Provided below is a list of potential drawings that
should be included in the contract documents. Not
Chain Link Fence Details
all drawings will be applicable to every project.
Chain Link Gate Details
Cover Sheet
Project Right-of-Way Map
Index of Drawings
Record of Borings (Geological Profile Sheets)
Abbreviations
Borrow Area Grading Plan, Sections and Soil
Legend
Test Data
Vicinity Map
New Utility Drawings
Location Map
New Access Road Profiles and Sections
Existing Site Conditions (including utilities)
Dewatering Plan
Test Pit and Boring Location Plan
Extraction Wells
Contractor Access Plan
Injection Wells
General Plan
Extraction Trench
Horizontal and Vertical Control
B-14