Content
NOTES .................................................................................................................................
iii
1.0 Sustainable Sites ............................................................................................................
1
1.R1 Erosion, Sedimentation and Water Quality
1.C6 Stormwater Management
Control
1.C1 Site Selection
1.C7 Landscape and Exterior Design to Reduce
Heat Islands
1.C2 Installation/Base Redevelopment
1.C3 Brownfield Redevelopment
1.C9 Optimize Site Features
1.C4 Alternative Transportation
1.C10 Facility Impact
1.C5 Reduced Site Disturbance
1.C11 Site Ecology
2.0 Water Efficiency ..............................................................................................................
5
2.C1 Water Efficient Landscaping
2.C3 Water Use Reduction
2.C2 Innovative Wastewater Technologies
3.0 Energy and Atmosphere .................................................................................................
6
3.R1 Fundamental Building Systems
3.R2 Minimum Energy Performance
3.C4 <<Deleted>>
3.R3 CFC Reduction in HVAC&R Equipment
3.C5 Measurement and Verification
3.C1 Optimize Energy Performance
3.C6 Green Power
3.C2 Renewable Energy
3.C7 Distributed Generation
4.0 Materials and Resources ................................................................................................
10
4.R1 Storage & Collection of Recyclables
4.C4 Recycled Content
4.C1 Building Reuse
4.C5 Local/Regional Materials
4.C2 Construction Waste Management
4.C6 Rapidly Renewable Materials
4.C3 Resource Reuse
4.C7 Certified Wood
5.0 Indoor Environmental Quality (IEQ) ................................................................................
13
5.R1 Minimum IAQ Performance
5.C5 Indoor Chemical and Pollutant Source
Control
5.R2 Environmental Tobacco Smoke (ETS)
5.C6 Controllability of Systems
Control
5.C1 IAQ Monitoring
5.C7 Thermal Comfort
5.C2 Increase Ventilation Effectiveness
5.C3 Construction IAQ Management Plan
5.C9 Acoustic Environment /Noise Control
5.C4 Low-Emitting Materials
5.C10 Facility In-Use IAQ Management Plan
6.0 Facility Delivery Process .................................................................................................
17
6.C1 Holistic Delivery of Facility
7.0 Current Mission ...............................................................................................................
18
7.C1 Operation and Maintenance
7.C2 Soldier and Workforce Productivity and
Retention
8.0 Future Missions...............................................................................................................
19
8.C1 Functional Life of Facility and Supporting
8.C2 Adaptation, Renewal and Future Uses
Systems
Facility Points Summary .......................................................................................................
20
SPiRiT Comment Sheet .......................................................................................................
22
Sustainable Project Rating Tool (SPiRiT) v.1.4.1
June 2002
Page iii