requirements in Appendix C. Requirements for collective protection for wartime facilities which
include an integral CCA will be designed in accordance with TM 5-855-1 and other criteria as
designated by the using command or authority having jurisdiction. New facilities designated as a
Class II CP system or required to incorporate design features that ease future installation of a CP
system will incorporate the requirements in Appendix D.
B-4. Additional Assistance.
Additional assistance is available from the Corps of Engineers Protective Design Center at the
address provided below.
U.S. Army Engineer District, Omaha
ATTN: CENWO-ED-S
215 North 17th Street
Omaha, NE 68102-4978
Telephone: (402) 221-4925/4918