Home
Download PDF
Order CD-ROM
Order in Print
Home
>
USACE Technical Letters - index
>
> ETL 1110-2-231
Initial Reservoir Filling Plan
Design Memorandum Content
Lost Creek Lake Pool Raise
Principles Underlying the Pool Raise Plan
Principles Underlying the Pool Raise Plan (cont)
Implementation - ETL-1110-2-2310008
The Resident Engineer will notify the following
Final Closure Actions
All District elements are directed to give maximum support to the pool filling operation
Appendix A. Water Control Plan Initial Lost Creek Filling
Resident Engineer Responsibilities
Parties to be furnished above information
Phase 2
General Information
Detailed Reservoir Regulation Plan
Water Control Personnel
Appendix B. Project Surveillance
Reservoir
Damsite
Routine and Alert Conditions
Reporting - ETL-1110-2-2310023
Appendix C. Fish Egg Protection and Surveillance
Biological Surveillance
Appendix D. Contingency Plan
Notification Plan
Resident Engineer will alert
R. Moore or alternate to alert
Chief Operations or alternates to alert
Emergency Procedures
Portland District Office
Appendix E. Safety Plan
Appendix F. Public Affairs
Lost Creek Lake Closure
Appendix G. Prefilling Inspection Team Recommendations
First Periodic Inspection-Inspection Team Recommendations
First Periodic Inspection-Inspection Team Recommendations (cont)
Appendix H. Transportation and Communications
Appendix I. Lost Creek Lake
Pertinent Data
Pertinent Data (cont)
Plate No. 1
ETL 1110-2-231