Appendix E - Site Visit Checklist
REVIEW RESULTS
PROJECT NUMBER/ LOCATION
SITE VISIT DATE
1391
ITEM
CORRECT IS
SCOPE
IS NOT
REQUIRED
COMMENTS
IS
RELEVANT
ATTACHED
CORRECT
PROJECT TITLE:
FY
d. Borrow & Waste Sites
Availability on Base or Off Base Site
Contractor or Government Furnished Materials
3. SITE IMPROVEMENTS
a. Existing Site Vegetation, Landscaping
Area of Existing Development
Wooded or Mixed Stand of Nature Growth to be Saved
Grass, Weed Vegetation, Shrubs & Trees
Proposed Landscaping Required
b. Traffic Flow and Detouring
Pavements and Walkways Adequacy and Widths
Marking and Lighting
Impact on Existing Circulation patterns
4. SITE UTILITIES
a. Electrical
Distance from Site to Electrical Distribution Systems
Are Service Lines Overhead or Underground?
Voltage of the Tapped Electrical System Loads Existing
Exterior Lighting
Does Existing System have Adequate Capacity for
Additional Expected Load
E-3