Appendix E - Site Visit Checklist
REVIEW RESULTS
PROJECT NUMBER/ LOCATION
SITE VISIT DATE
1391
ITEM
CORRECT IS
SCOPE
IS NOT
REQUIRED
COMMENTS
IS
RELEVANT
ATTACHED
CORRECT
PROJECT TITLE:
FY
Size and Location of Lines/Manholes
Quantity and Pressure of Steam Available
Location of Line and Valve pit
Condensate Lines
High Temperature Water Lines
Chilled Water Lines
f. Energy Plants
Type and Capacity
Adequacy
Availability
Central Plant or Individual Units Planned
g. Fuels
Natural Gas
High Pressure
Line size
Location
Fuel Oil and Storage Tanks
5. ENVIRONMENTAL ISSUES
a. Environmental Baseline Surveys/Preliminary Site
Assessment Complete?
E-5