ETL 1110-2-550
30 May 97
EPRI 1989
Moser, Males, Walsh, Grayman, and
Electric Power Research Institute. 1989. Hydro-
Strus 1995
Moser, D., Males, R., Walsh, M., Grayman, W., and
6419.
Strus, C. 1995. "The Use of Object-Oriented
Monte Carlo Simulation to Analyze Hydropower
Rehabilitation Proposals." In Proceedings of the
EPRI 1992
Electric Power Research Institute. 1992. Relia-
International Conference on Hydropower,
bility Centered Maintenance (RCM) Technical
San Francisco, California, July 1995. Vol. 2,
Handbook. Vol. 1 and 2. Report TR-100320.
pp 1087-1096. American Society of Civil Engi-
neers, New York.
EPRI 1994
Electric Power Research Institute. 1994. Relia-
Newell, Tanner, and Wagner 1995
bility Centered Maintenance Implementation in
Newell, V. A., Tanner, D. T., and Wagner, C. D.
the Nuclear Power Industry: Guidelines for
1995. "Hiwassee Dam Rehabilitation to Combat
Successful RCM Implementation. Report
Concrete Growth." In Proceedings of the Inter-
national Conference on Hydropower,
TR-103590.
San Francisco, California, July 1995. Vol. 2,
Kahl 1995
pp 1051-1058. American Society of Civil Engi-
Kahl, T. L. 1995. "Steel Penstock Rehabilitation
neers, New York.
Strategies." In Proceedings of the International
Conference on Hydropower, San Francisco,
Niznik and Conner 1995
California, July 1995. Vol. 2, pp 1019-1038.
Niznik, J. A., and Conner, G. C. 1995. "Feasibility
American Society of Civil Engineers, New York.
Studies to Rehabilitate TVA's Chickamauga
Navigation Facility Due to the Effects of Concrete
Growth." In Proceedings of the International
Knight 1971
Knight, F. H. 1971. Risk, Uncertainty, and Profit.
Conference on Hydropower, San Francisco,
California, July 1995. Vol. 2, pp 1041-1050.
University of Chicago Press, Phoenix Books.
Originally published in 1921.
American Society of Civil Engineers, New York.
Laurence 1991
Norlin, Allen, Campbell, Frey, Joy, Pierce,
Raisanin, Vaughn, and Woodward 1993
Laurence, H. 1991. "Engineering Risk Assessment
for Hydro Facilities." In Proceedings of the
Norlin, J. A., Allen, D., Campbell, D. J., Frey, M.,
International Conference on Hydropower, Denver,
Joy, J., Pierce, M., Raisanan, D. C., Vaughn, R., and
Colorado, July 1991. Vol. 2, pp 1238-1247.
Woodward, G. 1993. Condition Rating
Procedures/Condition Indicator for Hydropower
American Society of Civil Engineers, New York.
Equipment. U.S. Army Corps of Engineers,
Leemis 1995
Washington, D.C.
Models and Statistical Methods. Prentice-Hall,
PEC 1995
Inc., Englewood Cliffs, NJ.
Pacific Engineering Corporation (PEC). 1995.
DRAFT - Current Applications of Risk Analysis
Moser 1991
and Risk Analysis Methodologies Applied to
Moser, D. 1991. "Risk Analysis Applications for
Hydroelectric Facilities in North America. PEC
Dam Safety." In Proceedings of the International
Project Number 47508, Portland, OR.
Conference on Hydropower, Denver, Colorado,
July 1991. Vol. 2, pp 1255-1264. American
Society of Civil Engineers, New York.
A-2