Appendix B - DD Form 1391 Section Numbers
1C 2001
12608 P
REVISION DATE: 18 MAR 1998
1B ARMY
1A MCA (AS OF 05/27/1998 AT 07:39:40)
03 OCT 1984
LAF=.96
UM=E
1E Fort Engineers Center
1H Physical Fitness Training Center
1F District of Columbia
87796A 1L
1G 740 28
1M 12608
2F 7,100
2A PRIMARY FACILITY
5,523
Physical Fitness Center
m2
3,300
1,628
(5,373)
2A1
Antiterrorism Force Protection
LS
--
--
(35)
Building Information Systems
LS
--
--
(115)
2A2
2B SUPPORTING FACILITIES
1,213
Electric Service
LS
--
--
(355)
2B1
Water, Sewer, & Gas
LS
--
--
(78)
2B2
Steam and/or Chilled Water Distribution
LS
--
--
(120)
2B3
Paving, Walks, Curbs & Gutters
LS
--
--
(22)
2B4
LS
--
--
(96)
2B5
Site Imp(
507) Demo(
)
LS
--
--
(507)
2B6
Information Systems
LS
(15)
2B7
Antiterrorism Force protection
LS
(20)
2B8
Others
LS
(0)
2B9
ESTIMATED CONTRACT COST
6,763
CONTINGENCY PERCENT (0.00%)
0
2C
SUBTOTAL
6,763
SUPERVISION, INSPECTION & OVERHEAD
(5.70%)
384
2D
TOTAL REQUEST
7,147
TOTAL REQUEST (ROUNDED)
7,100
2F
INSTALLED EQT-OTHER APPROPRIATIONS
(0)
2G
3A Construct a standard-design physical fitness center to include a mezzanine,
gymnasium, six handball/racquetball courts, exercise and weight room, locker
rooms, showers, toilets, and saunas, indoor running track, laundry, storage,
supply and issue room, mechanical room, vending area and administrative areas.
Supporting facilities include utilities; electric service; paving, walks,
curbs and gutters; fire protection and alarm systems; exterior lighting;
parking; storm drainage; retaining wall; information systems; and site
improvements. Storm water management is linked to the installation system.
Support facility costs are high due to the topographical features of the site.
(steam) heating plant. Access for the handicapped will be provided.
________________________________________________________________________________
11. REQ: 4F 6,621 m2 4E
ADQT:4H NONE
SUBSTD: 4G 1,471 m2 4E
3C PROJECT:
Construct a standard-design physical fitness center. (Current Mission)
3D REQUIREMENT:
This project is required to support the military fitness program to
maintain the readiness of military assigned to Fort Engineers Center
which also includes two major tenants: The Engineering Center Institute of
Research and the Engineers Training center. There are no facilities at the
installation to support the mission, or at nearby installations or communities.
3E CURRENT SITUATION: