ETL 1110-1-163
30 Jun 96
CEGS-02935
Turf
Description
Unit
CWGS-03363
Concrete Cutoff Wall
Decontamination Facility
Lump Sum
CWGS-03365
Concrete for Concrete Cutoff Wall
Chain Link Fence
Linear Meters (ft)
02XXX
Well Abandonment
Access and Perimeter
M3 (CY)
Roads and Ditches
02XXX
Hazardous Material Excavation
Access and Perimeter
Metric Tons (tons)
and Handling
Road Surfacing
02XXX
Temporary Erosion and Sediment
Controls
Utility Relocations
Lump Sum
and Extensions
02XXX
Decontamination Facility
Monitoring Wells
Each
02XXX
Contaminated Liquids Removal
Monitoring Well
Each
02XXX
Demobilization and Project Close
Abandonment
Out
Extraction Wells
Each
02XXX
Extraction Wells
Injection Wells
Each
02XXX
Injection Wells
M2 (SF)
Extraction Trench
02XXX
Extraction Trench
M2 (SF)
Injection Trench
02XXX
Injection Trench
M2 (SF)
Vertical Barrier Wall
B-8. Quantity Tabulation Sheet for Cost
Piezometers
Each
Estimates
M3 (CY)
Random Fill
Provided below is a list of items that should be con-
M2 (SY)
Geotextile
sidered when developing a cost estimate for a vertical
barrier wall. Not all items will be applicable to every
Turf
Hectares (acres)
project.
Temporary Erosion
Lump Sum
Description
Unit
Control Features
All Other Items
Lump Sum
O&M Items
Lump Sum
Site Preparation (Con-
Lump Sum
struction Trailers,
Staging Areas, Parking
Hectares (acres)
Areas, etc.) Site
Clearing and Grubbing
B-16