ETL 1110-1-162
30 Sep 01
Has a property (deed) search of the site and adjoining
property been performed?
Y__N__N/A__
Has access for off-site monitoring been secured?
Y__N__N/A__
b. Geological Investigations.
Have geologic hazards such as earthquakes or active
faulting, landslides, or subsidence been identified?
Y__N__N/A__
or both, been determined?
Y__N__N/A__
Has material excavatability been evaluated?
Y__N__N/A__
chemical characteristics of the refuse, been determined?
Y__N__N/A__
Have landfill leachate levels, gradients, pathways, and exit
locations been determined?
Y__N__N/A__
Have the chemical characteristics of the leachate
been determined?
Y__N__N/A__
Have ground water conditions been evaluated, including
water levels, flow directions, and ground water chemistry?
Y__N__N/A__
Have the foundation soils been characterized?
Y__N__N/A__
Has the existing cover thickness and properties been
evaluated?
Y__N__N/A__
Have on-site or off-site borrow sources been located and
characterized?
Y__N__N/A__
c. Geotechnical Laboratory Requirements. Have the following laboratory soil tests been
performed on representative soil samples from the site and borrow areas?
Mechanical Analysis.
Y__N__N/A__
Y__N__N/A__
C-2