Provide detailed, informative statements as to precisely why AT/FP is provided, as appropriate.
Standard statement that must be included for specific projects:
Training Projects state average daily loads/throughout.
Barracks What is maximum and intended utilization.
3E. Current Situation
Does paragraph show how need is currently being met (how does unit currently operate), and what
hardships are being overcome? Address any waivers that may apply (i.e., OSHA, Safety, Security, etc.).
3F. Impact if Not provided
Describe what happens if project is not approved. Be specific and factual. Do not repeat current situation.
3G. Additional
Must contain Physical Security Statement (from Section 22).
Economic Analysis All MCA projects must include one of the following standard economic analysis
statements: (should be used exclusively. There is usually no reason to NOT prepare an economic analysis.
Most projects must have one!!!).
1. "An economic analysis has been prepared and utilized in evaluating this project."
2. "Alternative methods of meeting this requirement have been explored during project development.
This project is the only feasible option to meet the requirements.
AFH Projects Use same statements as MCA. If replacement construction is chosen, must state percent of
replacement cost to renovation (i.e., replacement 106% of renovation).
SECTION 4 FRONT PAGE DISCRETE DATA
Does UM correspond with Category Code in AR 415-28 & DA Pam 415-28?
Do total requirements for CATCODE correspond with TAB/HQ RPLANS?
Is Existing Substandard correct?
Does Existing Adequate correspond with TAB/HQRPLANS?
NOTE: If project conflicts with HQRPLANS, annotate reason why on checklist and possible or working
solution.
Are any related projects discussed?
Is Department of Defense Explosive Board (DDESB) approval required?
CHECK ON AVIATION PROJECTS:
Is Federal Aviation Administration (FAA) approval required?
Address Provisions for Handling Classified Information. Enter date for TEMPEST Assessment if
required?
Is Signature Block included, correct, and signed?
SECTION 5 RESERVED
SECTION 6 PLANNING AND DESIGN Reserved for USACE Use.
C-3