SECTION 7 GENERAL
Shows relationship of project to mission.
Describes general location. Is project IAW approved master plan or is siting approval request initiated?
Does project have supporting Capital Investment Strategy (CIS), if required?
Paragraph should contain justification not contained elsewhere on form.
Fill in name and phone number of Installation Engineer.
Fill in MACOM Certification when signed by MACOM Engineer.
SECTION 8 PRESENT ACCOMMODATIONS AND DISPOSITION
Is block in standard format? Does it contain applicable information?
Is Unit of Measure IAW AR 415-28 and DA Pam 415-28 for category code?
Are all facilities to be disposed listed? Check demolition total against total site demo cost in SECTION 2
and listed in SECTION 3. List all facilities used and their disposition (Retain, Demo, etc.)
SECTION 9 REAL PROPERTY MAINTENANCE (This information is optional and is only required by some
MACOM)
Are physical impacts described?
Are O&M costs included for existing and proposed facilities?
Is BMAR to be eliminated listed?
SECTION 10 ANALYSIS OF DEFICIENCIES
Narrative should identify all deficiencies and show how they hinder mission accomplishment. Write in
simple concise statements that factually describe the hurt.
SECTION 11 ECONOMIC ANALYSIS
Is Economic Analysis (EA) included (ECONPACK for Windows Version)? All projects should have an
analysis, few exceptions.
If EA not required, cite for justification and check SECTION 3 appropriate statement.
EXCEPTIONS:
If cost of analysis exceeds benefit of analysis.
If legal requirements or higher authority directives prevent alternative method for solving requirement.
Does the analysis examine FEASIBLE alternatives? Usually:
Lease
Renovate existing facilities
Use Government facilities on neighboring installations
Construct new facilities
Renovate-construct mix
C-4