Make sure the cost estimates from this section are properly rolled up to SECTION 2 Cost Block and
SECTION 13 (OPA Cost).
OACSIM is responsible to coordinate with USAISEC for review and certification of this section prior to
the MACOM Project Review Boards (PRB). Contact HQ USAISEC at Fort Detrick, MD if you have any
questions concerning the information systems requirement and cost estimates in this section.
SECTION 18 HISTORIC AND ARCHEOLOGICAL SITES
Has project been reviewed for impact?
Standard statement included?
Appropriate documentation included?
Signed by appropriate parties?
SECTION 19 ENERGY AND UTILITY REQUIREMENTS
Are capacities and utilization for each utility shown in tabular format?
Have energy sources been evaluated?
SECTION 20 - PROVISION FOR THE HANDICAPPED
Does this section contain standard statement?
SECTION 21 COMMERCIAL ACTIVITIES
Is Commercial Activities Analysis required (cite AR 5-20 exception)?
Is Commercial Activities Analysis signed by Comptroller?
SECTION 22 ANTI-TERRORISM/FORCE PROTECTION (AT/FP) DATA
Is AT/FP statement included?
Has valid Thread Assessment been prepared and summarized?
Check that one of the three standard AT/FP paragraphs has been entered here.
Have facility requirements generated by the threat assessment been included in appropriate sections
(Section 2 Cost Estimates and 3 Project Description of Work) of the 1391 form?
Are the signature blocks completed and signed by the Provost Marshal, by the Director of Public Work, and
by the Force Protection Officer?
C-6